Borwin 6

Summary

Short description

The platform has a topsides weight of 17,600 tons and is installed in the German North sea nearly 200 km off the German coast of Borkum, at a water depth of 36,8 metres.

Teknotherms were responsible for the complete detailed design and equipment delivery of the HVAC systems, including over 2000 items of Equipment and the main HVAC control panels and distributionboards.

More information

Alinea 1

(It is possible to add more text here.) If you would like more information regarding HVAC/R systems for the Offshore industry, don’t hesitate to get in touch

Alinea 2

(It is possible to add more text here.) If you would like more information regarding HVAC/R systems for the Offshore industry, don’t hesitate to get in touch.

Our scope included

  • 18 Air Handling Units
  • 14 Extract Fan Skids
  • 27 Air Intakes
  • 24 Fan Coil units
  • 7 pump sets
  • 30 Control panels/Distribution boards
  • 39 Variable speed drives
  • 688 Fire/shut off/balancing/pressure relief dampers
  • 37 Sound Attenuators
  • 302 instruments for temperature and pressure
  • 173 Ball/Butterfly/Shut off valves