The platform has a topsides weight of 17,600 tons and is installed in the German North sea nearly 200 km off the German coast of Borkum, at a water depth of 36,8 metres.
Teknotherms were responsible for the complete detailed design and equipment delivery of the HVAC systems, including over 2000 items of Equipment and the main HVAC control panels and distributionboards.